The following are four cost aspects, a SharePoint Engineer needs to account for in their work:
• Reduce costs as applicable be it code or architecture based.
• Reduce risk as applicable be it process, feature or functionality based.
• When reducing cost, higher risks must be accepted.
• When reducing risks, higher costs must be accepted.
No comments:
Post a Comment