Popular Posts

Tuesday, January 27, 2026

4 Critical Design Review (CDR) Criteria for a SharePoint Project

The following are four key critical design review for a SharePoint project.

Cost Estimate - Production cost model is known and kept updated, needed aspects are allocated and tracked against targets.  

Technical Baseline Documentation + Digital Artifacts - Detailed design is modeled which includes an interface description and mockup if desired.

Risk Assessment - All risk assessments and risk mitigation plans are documented, formally addressed and implemented. 

Technical Plans - The preliminary design review (PDR) is successfully completed. This includes all needed documentation, set-up and hand-off as needed. 

No comments:

Post a Comment